The scope included all site work and preparation including dewatering. Supply and installation of approximately 4,000m of storm sewer, 2,300m of sanitary sewer and 2,500m of watermain distribution piping at depths ranging from 4m – 7m and pipe size ranged from 375mm to 1,500mm. CCTV and testing of installed piping. Connections to existing services, provision of erosion control measures, site restoration and cleanup.