The work consists of reconstructing existing storage lagoons, supply and installation of 1,351m (150mm – 900mm) of forcemain. 

Completion Date

October, 2023

Location

Camrose

Client

City of Camrose

Project Details

The work consists of reconstructing existing storage lagoons, supply and installation of 1,351m (150mm – 900mm) of forcemain.  Supply and installation of overflow/outflow piping and concrete control structures and aeration piping. Construction of new building pad & access road, erosion & sediment controls, and restoration of site conditions/grading.  The work also includes removal and disposal of existing yard piping, aeration piping, control structures, and waste materials.